When LVP can go over the floor you already have, and when the old floor should come out first.
Yes, LVP can sometimes be installed over tile, vinyl, hardwood, laminate, or concrete when the existing floor is flat, stable, dry enough, and low enough that the added height will not create door, appliance, or transition problems. Carpet, loose floating floors, soft subfloors, and active moisture problems usually need to be handled first.
Tile is often a good candidate when the tile is well-bonded, the floor is flat, and the grout lines are not likely to show through the new LVP.
Some sheet vinyl or glue-down vinyl can stay if it is secure, smooth, and not adding a soft layer under the new floor.
LVP can often go over concrete when the slab is clean, stable, dry enough, and prepared for the product and underlayment being used.
When the existing floor qualifies, installing LVP over it can reduce demolition, shorten the project, and avoid removing a floor that does not need to come out.
Carpet, padding, tack strips, and staples need to be removed before LVP goes down. LVP needs a firm surface underneath, not a soft layer that can move.
Tile can sometimes stay, but not when pieces are loose, hollow, cracked, or shifting. Those areas need repair or the tile may need to come out first.
Wide grout lines, low spots, or uneven tile can affect how the new floor sits. Some floors can be skim-coated or leveled, while others may need removal.
Soft spots, damp areas, wet concrete, or active leaks should be fixed before installing new LVP flooring.
Every project is measured in person. We check the existing floor, prep or removal needs, moisture concerns, height changes, transitions, material choice, and any furniture or appliance moving before giving you a written estimate.
We measure the rooms, identify the current floor type, check clearances, and review whether the old floor can stay.
We address removal, patching, leveling, moisture concerns, and floor-height issues before the new LVP goes down.
The new LVP is installed with careful cuts, layout planning, and the right reducers, thresholds, or transition pieces where needed.
We walk the finished floor with you, review transitions and visible details, and answer final questions before wrapping up.
Schedule an in-home estimate. We'll check the existing floor, moisture signs, clearances, height changes, and transitions before recommending whether to install over it or remove it first.
Yes, LVP can sometimes be installed over tile, vinyl, hardwood, laminate, or concrete when the existing floor is flat, stable, dry enough, and low enough that the added height will not create door, appliance, or transition problems. Carpet, loose floating floors, soft subfloors, and active moisture problems usually need to be handled first.
Tile is often a good candidate when the tile is well-bonded, the floor is flat, and the grout lines are not likely to show through the new LVP.
Some sheet vinyl or glue-down vinyl can stay if it is secure, smooth, and not adding a soft layer under the new floor.
LVP can often go over concrete when the slab is clean, stable, dry enough, and prepared for the product and underlayment being used.
When the existing floor qualifies, installing LVP over it can reduce demolition, shorten the project, and avoid removing a floor that does not need to come out.
Carpet, padding, tack strips, and staples need to be removed before LVP goes down. LVP needs a firm surface underneath, not a soft layer that can move.
Tile can sometimes stay, but not when pieces are loose, hollow, cracked, or shifting. Those areas need repair or the tile may need to come out first.
Wide grout lines, low spots, or uneven tile can affect how the new floor sits. Some floors can be skim-coated or leveled, while others may need removal.
Soft spots, damp areas, wet concrete, or active leaks should be fixed before installing new LVP flooring.
We measure the rooms, identify the current floor type, check clearances, and review whether the old floor can stay.
We address removal, patching, leveling, moisture concerns, and floor-height issues before the new LVP goes down.
The new LVP is installed with careful cuts, layout planning, and the right reducers, thresholds, or transition pieces where needed.
We walk the finished floor with you, review transitions and visible details, and answer final questions before wrapping up.
Schedule an in-home estimate. We'll check the existing floor, moisture signs, clearances, height changes, and transitions before recommending whether to install over it or remove it first.
Get a Free Estimate